The Build, Build, Build program was launched in 2017. The program includes airports, railways, bus rapid transits, major roads and bridges, seaports, energy facilities, water resource projects and irrigation systems, and flood control facilities. The infrastructure projects near The Velaris Residences are as follows:
1. Bonifacio Global City-Ortigas Link Bridge
The Bonifacio Global City-Ortigas Link Bridge is halfway completed as of posting. It aims to reduce the travel time from the Bonifacio Global City and Ortigas CBDs. It will also serve as an alternative route to EDSA and C5.
2. NLEx-SLEx Connector Road
The NLEx-SLEx Connector Road aims reduce the travel time from SLEX to NLEX from 2 hours to 20 minutes and it is projected to be completed by the first quarter of 2021.
3. Metro Manila Skyway Stage 3
The Metro Manila Skyway Stage 3 Project focuses on providing better accessibility when traveling to and from Manila, Quezon City, and other neighboring cities. As of posting, three out of five sections of the project are nearly completed.
4. MRT-4 Project
The MRT-4 Project aims to give better accessibility to public transportation for the following cities – Quezon City, San Juan City, Mandaluyong City, Pasig City, and Ortigas Center. This project is projected to be operational by 2025.
5. Metro Manila Subway
The Metro Manila Subway is designed to connect with other urban rail transit services in the region. This is scheduled to partially open in 2022 and to open in full swing by 2026.
6. C5 MRT Line 10 (Proposed)
The C5 MRT Line 10 is a proposed project to cost P92.58 billion and is currently awaiting approval from the relevant approving bodies.